Little Nerang Dam Access Track Temporary Upgrade
Temporary works advice and design to upgrade damaged areas of the access track to allow safe egress of light and heavy vehicles.
Fairways Estate | Hatton Vale
Design reporting for existing pavements. Level One Earthworks Inspection and Testing. Ground Improvement recommendations for construction over weak alluvial soils
Monterea Residential Development | Ripley
Level One Earthworks inspection and testing. Temporary works for trench safety. Retaining Wall design parameters.
Banana Street and Bay Islands Water Taxi Redevelopment | Redland Bay
Geotechnical investigation for proposed shopping centre, residential towers, pavements and carparks. Recommendations for construction over alluvial soil deposits.
The Lakes College Sports Centre
Level One Earthworks Inspection and Testing. Pavement construction recommendations. Foundation verification. Temporary works safety advice for cuts and safe trench access.
Les Moore Park Redevelopment | Victoria Point
Recommendations for pavement and stormwater construction over weak ground and high-water tables
The Ridge Residential Development | Hatton Vale
Slope hazard risk assessment. Level One Earthworks Inspection and Testing. Recommendations for pavement construction. Safety assessments for access into deep excavations and trenches.
Gainsborough Greens Residential Development
Recommendations for Pavement construction over expansive soils. Ground Improvement recommendations over expansive and reactive soils.
Denmark Hill Pedestrian Bridge | Ipswich
Ground Investigation for bridge construction. Foundation verification for abutments.
Eildon Hill Walking Track | Windsor
Recommendations for construction of walking tracks on steep slopes. Temporary works recommendations for safe work methods on steep slopes. Stability analysis for retaining walls on steep slopes.